Re-Railing Works

Overview

  • Contract name:
  • Re-Railing Works
  • Client:
  • London Underground Ltd
  • Duration period:
  • Various – Including Weekend Possessions
  • Form of contract:
  • Bespoke
  • Type of work:
  • Track Work - Re-Railing
Welding

Cleshar have 19 years of experience in Re Railing Works including:

  • Re-Railing
  • Stressing
  • Holding Down Bolts
  • Re Ballasting
  • Track Welding
  • Tube Re-Conditioning Works
  • Points & Crossings (Junction works)
  • Clearing TRV Faults
  • Track Geometry Works
  • Track Re-Alignments
  • Lift & Pack & Slewing track
  • Conductor Rail Installation & Maintenance

All works are carried out by our own in-house resources.

Examples of our current contracts:


Sub surface lines Re-Railing - Various Sites  

General Scope:

  • Nightly rail renewals replacing like for like rail
  • Changing bullhead to rail flatbottom rail
  • Stressing of all sites by in-house staff including Stressing Engineers
  • Weekend possessions – 52 hour closure


Re-Railing Tube Sections

General Scope: Prior to recon works we have a gang of 26 operatives specialising in re-railing on re con sites working on a nightly basis.  Works are on-going and sites range from 300m to 1.2km – in engineering hours. 


Points & Crossings (Junction Works)

We have renewed and refurbished points and crossing across the whole of the Tube Lines network on the  Jubilee, Northern and Piccadilly lines. 

General Scope:

  • Re-timbering
  • Replacing fixtures and fittings
  • Kango packing