Re-Railing Works
Overview
- Contract name:
- Re-Railing Works
- Client:
- London Underground Ltd
- Duration period:
- Various – Including Weekend Possessions
- Form of contract:
- Bespoke
- Type of work:
- Track Work - Re-Railing
Cleshar have 19 years of experience in Re Railing Works including:
- Re-Railing
- Stressing
- Holding Down Bolts
- Re Ballasting
- Track Welding
- Tube Re-Conditioning Works
- Points & Crossings (Junction works)
- Clearing TRV Faults
- Track Geometry Works
- Track Re-Alignments
- Lift & Pack & Slewing track
- Conductor Rail Installation & Maintenance
All works are carried out by our own in-house resources.
Examples of our current contracts:
Sub surface lines Re-Railing - Various Sites
General Scope:
- Nightly rail renewals replacing like for like rail
- Changing bullhead to rail flatbottom rail
- Stressing of all sites by in-house staff including Stressing Engineers
- Weekend possessions – 52 hour closure
Re-Railing Tube Sections
General Scope: Prior to recon works we have a gang of 26 operatives specialising in re-railing on re con sites working on a nightly basis. Works are on-going and sites range from 300m to 1.2km – in engineering hours.
Points & Crossings (Junction Works)
We have renewed and refurbished points and crossing across the whole of the Tube Lines network on the Jubilee, Northern and Piccadilly lines.
General Scope:
- Re-timbering
- Replacing fixtures and fittings
- Kango packing